Length of commissioned water supply networks (rural, quarterly)

Code: 1.04.01.0061 · Updated: 2026-04-27

Length of commissioned water supply networks (rural, quarterly)
Category / Region 2019-Q42020-Q12020-Q22020-Q32020-Q42021-Q12021-Q22021-Q32021-Q42022-Q12022-Q22022-Q32022-Q42023-Q12023-Q22023-Q32023-Q42024-Q12024-Q22024-Q32024-Q42025-Q12025-Q22025-Q32025-Q42026-Q1
Republic of Uzbekistan 1873.753.1243.7759.31159.878.3357.1930.62197.894.4378.51460.83741.3502.91023.81684.72935.3102.2247.8397.61004.68.789.9297.9745.031.7
Republic of Karakalpakstan 152.80.027.9109.2109.20.02.2224.3395.817.254.1249.7467.642.2137.6291.4350.810.157.762.9137.80.045.556.156.10.0
Andijan region 295.05.331.8112.1245.444.863.872.888.50.031.4259.7389.70.064.475.7971.00.00.00.081.50.00.00.00.00.0
Bukhara region 170.22.04.55.034.10.00.00.00.22.22.24.5371.820.549.449.449.40.00.00.00.00.00.00.00.00.0
Jizzakh region 115.88.874.496.0114.716.3236.2381.1429.934.1181.0259.4503.9369.2499.9878.6869.917.645.689.6156.77.211.7161.2354.212.8
Kashkadarya region 30.70.00.00.014.30.00.014.619.40.011.611.611.60.00.00.00.00.00.00.00.00.00.00.00.00.0
Navoi region 88.30.03.03.06.20.00.00.00.00.00.00.00.00.00.054.054.00.00.00.00.00.00.00.00.00.0
Namangan region 277.50.010.511.043.30.010.310.310.30.00.0153.4284.60.030.530.530.50.00.00.00.00.00.00.00.00.0
Samarkand region 124.417.042.444.657.610.016.816.817.79.928.056.5403.10.022.726.235.60.00.00.0120.40.00.00.00.00.0
Surkhandarya region 11.00.01.71.710.00.00.00.0669.30.00.018.4492.20.033.333.333.30.00.00.0105.20.00.00.080.10.0
Syrdarya region 0.00.03.13.03.10.01.81.81.80.00.00.035.30.00.00.00.00.00.00.00.00.00.00.036.30.0
Tashkent region 0.00.00.00.099.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0
Fergana region 194.020.022.053.671.77.226.054.377.431.070.2215.3297.10.022.831.2179.71.36.646.3133.01.532.774.4140.818.9
Khorezm region 414.00.022.4320.1351.20.00.0154.6487.50.00.0232.3484.471.0163.2214.4361.173.2137.9198.8270.00.00.06.277.50.0
Tashkent city 0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0

Download

CSVJSONXMLXLSXPDF

Metadata

Indicator name
Length of commissioned water supply networks (rural, quarterly)
Periodicity
quarterly
Unit of measurement
kilometer
Calculation methodology
https://lib.stat.uz/images/metodika/bujru--43_tayyor-qurilish-maxsulot.pdf
Official statistics preparer
National Statistics Committee of the Republic of Uzbekistan
Classifiers
Departmental classifier "System of designation of administrative-territorial entities (objects) of the Republic of Uzbekistan" (SOATO)
Name of department
Department of Investment and construction statistics
Responsible officer name
Xidiraliyeva Dildorahon Rahmidinovna
Phone number :
+99871 203 80 00 (1163)
Email
M.Jomolov@stat.uz
Primary source of information
Statistical reporting
Note
Preliminary data.
Calculation methodology
"The commissioning of a water pipeline is reflected on the basis of two units of measurement: - the capacity of the water pipeline in thousands of cubic meters per day (based on the capacity of the water pipeline structures that limit the water supply); - the length of water pipelines and street networks in kilometers (the total length of the water pipeline and networks is determined in a single calculation by the length of all pipes laid in one line; if the pipes are laid in several rows, then the length is determined by the total length of all rows)."